Assignment One - PART B:  Construction Risk Assessment

Due date: Monday 30th September 2024

Assignment One - PART B contributes towards 20% of your grade for this course.

Background

The purpose of this assignment is for you to confirm your understanding of construction and engineering when managing subcontractors.  As part of this, you need to identify the associated risks.

Provide an assessment on potential risks to be encountered during the construction operations of the works that have been provided for you.

Pre-recorded Site Tour

The following link will take you to the pre-recorded question and answer session of the now complete extension to the Sir Neil Waters Building. The video includes commentary from the main contractor, past students and senior lecturer to assist you in answering all the questions for this assignment. https://youtu.be/FQND2yhYa4U Apply your knowledge learned from class and the information from your site example. This will cover construction techniques that are being adopted that will allow the buildability to run as per your previously identified construction program.

Identify all necessary construction materials, plant and equipment, waste and note all potential health and safety issues.

This report is to be submitted to your manager for review.

ASSESSMENT

The assignment consists of three tasks worth a total of 100 marks. Overall, the assignment is worth 20% of the total mark for the course. Your score out of the 100% will be factored by 20% to establish the score contribution to the overall mark for the course.

Carry out a risk assessment on the proposed works for this project.

PART 1.

Provide a written report that contains the following:

A.  Identify and analyse one (1) risk item connected to the proposed works for each of the following:

a)  Materials management , supply and logistics;

b)  Health and safety management;

c)  Construction plant and equipment;

d)  Quality management and assurance; and

e)  Construction waste management.

PART 2

B.  Provide a detailed assessment of the risks’ resultant effects on the success of the construction project if not treated.

C.  Identify realistic treatment(s) to the construction risks identified.

PART 3

Draw up a risk register (in table form) containing the construction risks identified and the treatment(s) to these risks. The risk register should contain the following:

A.  Item number;

B.  Description;

C.  Risk level (high, medium or low);

D.  Impact without treatment (cost impact, time impact, quality impact); and

E.  Responses (avoid, accept, transfer, mitigate).

SUBMISSION

Please submit your scripts in editable electronic formats (Word,   where applicable) . Please no pdf formats! Submit ON OR BEFORE MONDAY 30th of September 2024 DEADLINE via STREAM site for the course. The feedback you will receive will be in electronic format.

Research

Use the information provided during your online Site Visit and other relevant resources such as the lecture slides, textbooks, journals articles, NZ Building Code, New Zealand contractors and construction managers for this assignment.

Assessment Specifications

Present your report in A4 format with appropriate APA in-text citation and cross references where applicable.

The total word count limit for the report is between 2,500 - 3,000 words.

As discussed in your course guide, the following applies to this assignment:

Your assignments must be in the following format:

Softcopy:  This  should  be  submitted  to  the  Stream  site  for  this course.  The work  must  be  in  its  original  format  (Word,  Excel  or software) .

PDF can only be accepted for appendix documents only.

If the main work is in PDF, your submission will not be accepted!

This course has been selected for  inclusion in the Massey University plagiarism detection  programme.  Massey  University  is  quite  serious about   plagiarism.   Plagiarism   is   considered   to   be   an   academic misconduct.

The  content  of  this  report  will  count  for  90%  of  the  total  marks  to  be awarded.

The remaining  10% will be awarded for quality of written work including correct  grammar  and  spelling,  overall  report  presentation  and  correct referencing style.

This assignment is available for at least  1  month before the submission deadline.  As  such,  it  should  be  received  by  the  due  date.  Computer crashes are not accepted as a reason for late submissions, so copy your assignment to an external drive on a regular basis as you work on it. Also, other  workload  (personal  and  academic)  will  not  be  considered  as  a special circumstance.

In the interest of fairness to students who have handed assignments in on time, late assignments will be penalised, at a rate of 3% for each calendar day late. Unless extenuating circumstances are present, work handed in more than 7 calendar days late will not receive any marks.

If you cannot meet the due date, it is essential that you contact the course coordinator for an extension at least 5 working days prior to the deadline.

Note: Extensions are not granted without good reason.

Your  request for  extension  must  be  accompanied  by  supporting document(s) according  to  the  Massey  University  Policy  Guide  for  assessment  procedures (page 2) .

ASSIGNMENT ONE - PART B - MARKING SCHEME

Students Details

Assignment Details

Student ID:

Course Code:

218.230

Surname:

Course Name:

Construction Operations and Control

First Name:

Set By:

HvH

Programme:

Construction

Assignment:

Assignment One - PART B

Level/Year:

UG

Due Date:

30.09.24

Marks

Obtained Marks

Part 1 (30%) Risk Identification

5 Potential Construction Risks

10

Risks Adequately Analysed

20

Part 2 (20%) Risk Assessment

Detailed Assessment

20

Part 3 (40%) Risk Register

Identified Risks

10

Risk Register Form

30

Part 4 (10%) Quality of Report

Structure

3

Wording

3

References

4

TOTAL MARKS

100

Penalty for Late Submission: 3% per day for each calendar day up to

7 days; after this no marks will be gained.

Penalty for Word Count (2,500 - 3,000) 1% per +/- 100 words

Penalty for Plagiarism: Turnitin score: % (Apply penalty or comment below if score is greater than 15%)