Due date: Monday 30th September 2024
Assignment One - PART B contributes towards 20% of your grade for this course.
Background
The purpose of this assignment is for you to confirm your understanding of construction and engineering when managing subcontractors. As part of this, you need to identify the associated risks.
Provide an assessment on potential risks to be encountered during the construction operations of the works that have been provided for you.
Pre-recorded Site Tour
The following link will take you to the pre-recorded question and answer session of the now complete extension to the Sir Neil Waters Building. The video includes commentary from the main contractor, past students and senior lecturer to assist you in answering all the questions for this assignment. https://youtu.be/FQND2yhYa4U Apply your knowledge learned from class and the information from your site example. This will cover construction techniques that are being adopted that will allow the buildability to run as per your previously identified construction program.
Identify all necessary construction materials, plant and equipment, waste and note all potential health and safety issues.
This report is to be submitted to your manager for review.
ASSESSMENT
The assignment consists of three tasks worth a total of 100 marks. Overall, the assignment is worth 20% of the total mark for the course. Your score out of the 100% will be factored by 20% to establish the score contribution to the overall mark for the course.
Carry out a risk assessment on the proposed works for this project.
PART 1.
Provide a written report that contains the following:
A. Identify and analyse one (1) risk item connected to the proposed works for each of the following:
a) Materials management , supply and logistics;
b) Health and safety management;
c) Construction plant and equipment;
d) Quality management and assurance; and
e) Construction waste management.
PART 2
B. Provide a detailed assessment of the risks’ resultant effects on the success of the construction project if not treated.
C. Identify realistic treatment(s) to the construction risks identified.
PART 3
Draw up a risk register (in table form) containing the construction risks identified and the treatment(s) to these risks. The risk register should contain the following:
A. Item number;
B. Description;
C. Risk level (high, medium or low);
D. Impact without treatment (cost impact, time impact, quality impact); and
E. Responses (avoid, accept, transfer, mitigate).
SUBMISSION
Please submit your scripts in editable electronic formats (Word, where applicable) . Please no pdf formats! Submit ON OR BEFORE MONDAY 30th of September 2024 DEADLINE via STREAM site for the course. The feedback you will receive will be in electronic format.
Research
Use the information provided during your online Site Visit and other relevant resources such as the lecture slides, textbooks, journals articles, NZ Building Code, New Zealand contractors and construction managers for this assignment.
Assessment Specifications
Present your report in A4 format with appropriate APA in-text citation and cross references where applicable.
The total word count limit for the report is between 2,500 - 3,000 words.
As discussed in your course guide, the following applies to this assignment:
Your assignments must be in the following format:
Softcopy: This should be submitted to the Stream site for this course. The work must be in its original format (Word, Excel or software) .
PDF can only be accepted for appendix documents only.
If the main work is in PDF, your submission will not be accepted!
This course has been selected for inclusion in the Massey University plagiarism detection programme. Massey University is quite serious about plagiarism. Plagiarism is considered to be an academic misconduct.
The content of this report will count for 90% of the total marks to be awarded.
The remaining 10% will be awarded for quality of written work including correct grammar and spelling, overall report presentation and correct referencing style.
This assignment is available for at least 1 month before the submission deadline. As such, it should be received by the due date. Computer crashes are not accepted as a reason for late submissions, so copy your assignment to an external drive on a regular basis as you work on it. Also, other workload (personal and academic) will not be considered as a special circumstance.
In the interest of fairness to students who have handed assignments in on time, late assignments will be penalised, at a rate of 3% for each calendar day late. Unless extenuating circumstances are present, work handed in more than 7 calendar days late will not receive any marks.
If you cannot meet the due date, it is essential that you contact the course coordinator for an extension at least 5 working days prior to the deadline.
Note: Extensions are not granted without good reason.
Your request for extension must be accompanied by supporting document(s) according to the Massey University Policy Guide for assessment procedures (page 2) .
ASSIGNMENT ONE - PART B - MARKING SCHEME
Students Details |
Assignment Details |
||
Student ID: |
|
Course Code: |
218.230 |
Surname: |
|
Course Name: |
Construction Operations and Control |
First Name: |
|
Set By: |
HvH |
Programme: |
Construction |
Assignment: |
Assignment One - PART B |
Level/Year: |
UG |
Due Date: |
30.09.24 |
|
Marks |
Obtained Marks |
Part 1 (30%) Risk Identification
5 Potential Construction Risks |
10 |
|
Risks Adequately Analysed |
20 |
|
Part 2 (20%) Risk Assessment
Detailed Assessment |
20 |
|
Part 3 (40%) Risk Register
Identified Risks |
10 |
|
Risk Register Form |
30 |
|
Part 4 (10%) Quality of Report
Structure |
3 |
|
Wording |
3 |
|
References |
4 |
|
TOTAL MARKS |
100 |
|
Penalty for Late Submission: 3% per day for each calendar day up to 7 days; after this no marks will be gained. |
|
|
Penalty for Word Count (2,500 - 3,000) 1% per +/- 100 words |
|
|
Penalty for Plagiarism: Turnitin score: % (Apply penalty or comment below if score is greater than 15%) |
|
|
FINAL TOTAL MARKS |
|