Improving the Manufactring process at Arrow Industries

Assignment Task

Arrow Industries is a manufacturing company of tractor components for OEMs. Over the last two years Arrow industries  have lost two of their major orders to overseas competitors. In an attempt to improve the manufacturing performance to be able to continue in a competitive environment, the company has employed you, as an expert in Lean principles, to turn around their manufacturing performance.

Production Processes

An initial analysis of the production data identified that the Tubular manufacturing area is one of the more profitable areas of the company, in particular the  product family that contains the two parts, TB115 and  TB116 which are high value, high volume, and runner products.

Arrow industries is currently producing to mass production principles. The machines have a functional layout (Figure 1) and produce parts in large batches. All moves within the same section are done manually, using trolleys.

The key manufacturing processes include sawing, turning (lathe work: lathe 1 and lathe 2), milling, painting through to assembly and packing.

The painting process is perform. in a separate building in batches of 500.

Figure 1. Current facility layout plan

Customer Requirements

· 12,500 tubes per month

o 5,700 TB115

o 6,800 TB116

· Products are delivered every day to the customer by lorry.

Work Time

· 20 working days in a month

· Operating a 3 shift system in all production operations

· 6am-2pm, 2pm-10pm, 10pm-6am

· 30 mins lunch and two 15 min breaks per shift

Production Control information

Supplier Brooks ltd provides the metal raw material on weekly bases. Every Wednesday morning, MRP system at Arrow industries sent a notification to Brooks ltd for the requirements of raw material from the approaching week. Brooks ltd deliver straight to Arrow industries on Friday.

Weekly schedule are generate by the MRP system and each department receives a weekly instruction by email. Daily shipment is required by customer.

PROCESS INFORMATION

The processes to produce the tubes TB115 and TB116 occur in the following order:

Processes

Cycle Time (secs)

Change Over time (mins)

Process

Availability

Quality Pass rate

Saw (shared resource )

EPE 2 weeks

55

1.5

97%

99%

Lathe 1

150

11

84%

94%

Lathe 2

130

2

95%

85%

Mill

82

1.1

90%

95%

Painting (in a separate building)

1200 (20 mins)

15

95%

95%

Assy Carrier & Inner

68

None

100%

95%

Final Assembly

175

None

95%

83%

Packing

75

None

100%

98%

WIP (Inventory)

· The raw material  before the first process ( Saw)  it is estimated to stay 5 days (waiting ) before passing to their respective  processes.

· The observed WIP inventory after each process are:

Processes

WIP

Saw

1,500 TB115

1,100 TB116

Lathe 1

600 TB115

750 TB11

Lathe 2

400 TB115

850 TB116

Mill

1200 TB115

1350 TB116

Painting (in a separate building)

790 TB115

640 TB116

Assy Carrier & Inner

360 TB115

370 TB116

Final Assembly

590 TB115

450 TB116

Packing

820 TB115

630 TB116

· Due to the transportation required before and after the painting process there are two extra WIP inventories: One before the painting process and another one before the Assembly of the carrier and inner as follows:

o Before Painting:     900 TB115

1,200 TB116

o  Before Assembly Carrier and Inner :     940 TB115

750 TB116

Despatch Department

The observed inventory of finish goods observed ready to be sent to customers is:

4,200 TB115

3,800 TB116.

Assignment tasks and marks distribution:

1. Using the data provided develop the current state map for manufacturing facility.

(15 marks)

2. Calculate the timeline,  lead times, Takt time and VA ratio.

(30 marks)

3. Using the information provided and lean tools knowledge, critically appraise the current state of Arrow Industries, this should include Future state map with new recommendations.

(45 marks)

4. Report structure, presentation style. and neatness.

(10 marks)

· Design and optimize the current production process that meets customer requirements.

· Appraise the manufacturability of the component based on both technical & process compliance assisted by virtual tools.

The report to include and identified individual student contribution (2000 – 2500 words).

Submission Instructions:

You will submit the assignment on or before the due date. The submission must be in Microsoft Word, other file types will not be marked, please submit on link on turn it in. If you are graded as a pass on any of your submission attempts you will have completed the Core assessment part of this module.

Development of Skills and Attributes:

· Act with integrity

o Have awareness of how to act in a professional environment

o Take pride in my work and my achievements, leading by example

· Adapt my approach

o am resilient with the ability to self-reflect and react positively to change, challenging situations, or areas of uncertainty

· Think Creatively

o want to continue learning, recognising that personal development is ongoing and life-long.

· Communicate effectively

o Collaborate and work with other well

o Have awareness and appreciation and respect for diversity of background culture and thought



站长地图